{
  "schemaVersion": "2.0",
  "schemaName": "govscope.requirements_matrix.customer_v2",
  "caseKey": "opp-2e9d7992da19477a939a85c9c169ced8",
  "samUrl": "https://sam.gov/opp/2e9d7992da19477a939a85c9c169ced8",
  "opportunityTitle": "DA10--Enterprise Digital Government Enablement (EDGE) 36C10B26Q0245",
  "summary": "This solicitation includes 36 required obligations and 0 attachment-derived requirements.",
  "resolvedDeadlines": null,
  "performancePeriodSchedule": {},
  "performancePeriodExplicitFields": {},
  "verificationChecklist": [],
  "qualityAssessment": {},
  "rows": [
    {
      "rowId": "REQ-013",
      "matrixSection": "Security / Privacy",
      "requirement": "Implement VA Critical Security Controls in network-connected software systems prior to VA authorization.",
      "obligation": "MANDATORY",
      "obligationLabel": "Required",
      "criticality": "high",
      "lifecycle": null,
      "applicability": {},
      "evidenceArtifacts": [],
      "whatToPrepare": null,
      "sourceBasis": null,
      "rowConfidence": {},
      "validationFlags": [],
      "evidenceLinks": [],
      "evidence": {
        "sourceDocumentId": "doc_3260",
        "sourceDocumentHref": "https://capture.govscope.io/cases/opp-2e9d7992da19477a939a85c9c169ced8/sources/doc_3260?requirement=REQ-013",
        "sourceDocumentName": "EDGE PWS Draft.docx",
        "sourceSection": "6.1.2 ZERO TRUST – VA CRITICAL SECURITY CONTROLS",
        "sourcePage": "65",
        "sourceExcerpt": "Effective July 1, 2025, the Contractor shall implement these VA Critical Security Controls, within any network connected software system or service prior to being authorized for use in the VA. This functional requirement is not negotiable, and Plan of Action & Milestones (POAM) will not be accepted",
        "citationQuality": "Section-level citation"
      }
    },
    {
      "rowId": "AUTO-SECURITY-15",
      "matrixSection": "Security / Privacy",
      "requirement": "ACCESS AND CONFIGURATION HANDOVER The outgoing Contractor shall transition: System administrator accounts, role-based access, and credentials (in accordance with VA security policy) Source code repositories, configuration files, and CI/CD pipeline documentation Platform configuration settings, APIs, plug-ins, and connectors Test scripts, automated testing tools, and deployment processes All accounts and licenses shal",
      "obligation": "MANDATORY",
      "obligationLabel": "Required",
      "criticality": "high",
      "lifecycle": null,
      "applicability": {},
      "evidenceArtifacts": [],
      "whatToPrepare": "Security and compliance response",
      "sourceBasis": null,
      "rowConfidence": {},
      "validationFlags": [],
      "evidenceLinks": [],
      "evidence": {
        "sourceDocumentId": "doc_3260",
        "sourceDocumentHref": "https://capture.govscope.io/cases/opp-2e9d7992da19477a939a85c9c169ced8/sources/doc_3260?requirement=AUTO-SECURITY-15",
        "sourceDocumentName": "EDGE PWS Draft.docx",
        "sourceSection": "ACCESS AND CONFIGURATION HANDOVER",
        "sourcePage": null,
        "sourceExcerpt": "ACCESS AND CONFIGURATION HANDOVER The outgoing Contractor shall transition: System administrator accounts, role-based access, and credentials (in accordance with VA security policy) Source code repositories, configuration files, and CI/CD pipeline documentation Platform configuration settings, APIs, plug-ins, and connectors Test scripts, automated testing tools, and deployment processes All accounts and licenses shal",
        "citationQuality": "Section-level citation"
      }
    },
    {
      "rowId": "AUTO-SECURITY-3",
      "matrixSection": "Security / Privacy",
      "requirement": "Ensure all COTS products, software configurations, customizations, and new software are PIV card-enabled using VA EA and IAM approved ETGs.",
      "obligation": "MANDATORY",
      "obligationLabel": "Required",
      "criticality": "high",
      "lifecycle": null,
      "applicability": {},
      "evidenceArtifacts": [],
      "whatToPrepare": null,
      "sourceBasis": null,
      "rowConfidence": {},
      "validationFlags": [],
      "evidenceLinks": [],
      "evidence": {
        "sourceDocumentId": "doc_3260",
        "sourceDocumentHref": "https://capture.govscope.io/cases/opp-2e9d7992da19477a939a85c9c169ced8/sources/doc_3260?requirement=AUTO-SECURITY-3",
        "sourceDocumentName": "EDGE PWS Draft.docx",
        "sourceSection": "FEDERAL IDENTITY, CREDENTIAL, AND ACCESS MANAGEMENT (FICAM)",
        "sourcePage": null,
        "sourceExcerpt": "The Contractor shall ensure Commercial Off-The-Shelf (COTS) product(s), software configuration and customization, and/or new software are Personal Identity Verification (PIV) card-enabled",
        "citationQuality": "Section-level citation"
      }
    },
    {
      "rowId": "AUTO-SECURITY-4",
      "matrixSection": "Security / Privacy",
      "requirement": "Provide user authentication services compliant with NIST SP 800-63-3, VA Handbook 6500, and VA IAM enterprise requirements.",
      "obligation": "MANDATORY",
      "obligationLabel": "Required",
      "criticality": "high",
      "lifecycle": null,
      "applicability": {},
      "evidenceArtifacts": [],
      "whatToPrepare": null,
      "sourceBasis": null,
      "rowConfidence": {},
      "validationFlags": [],
      "evidenceLinks": [],
      "evidence": {
        "sourceDocumentId": "doc_3260",
        "sourceDocumentHref": "https://capture.govscope.io/cases/opp-2e9d7992da19477a939a85c9c169ced8/sources/doc_3260?requirement=AUTO-SECURITY-4",
        "sourceDocumentName": "EDGE PWS Draft.docx",
        "sourceSection": "FEDERAL IDENTITY, CREDENTIAL, AND ACCESS MANAGEMENT (FICAM)",
        "sourcePage": null,
        "sourceExcerpt": "The Contractor shall ensure all Contractor delivered applications and systems provide user authentication services compliant with the National Institute of Standards and Technology (NIST) Special Publication (SP) 800-63-3, VA Handbook 6500",
        "citationQuality": "Section-level citation"
      }
    },
    {
      "rowId": "AUTO-SECURITY-14",
      "matrixSection": "Security / Privacy",
      "requirement": "KNOWLEDGE TRANSFER The outgoing Contractor shall provide knowledge transfer to the incoming Contractor and the Government, including but not limited to: Project architecture, design, and data model documentation Configuration details of LCNC applications, workflows, automations, and integrations Security and compliance documentation, including ATO artifacts Current backlog, product roadmap, unresolved defects, and re",
      "obligation": "MANDATORY",
      "obligationLabel": "Required",
      "criticality": "high",
      "lifecycle": null,
      "applicability": {},
      "evidenceArtifacts": [],
      "whatToPrepare": "Security and compliance response",
      "sourceBasis": null,
      "rowConfidence": {},
      "validationFlags": [],
      "evidenceLinks": [],
      "evidence": {
        "sourceDocumentId": "doc_3260",
        "sourceDocumentHref": "https://capture.govscope.io/cases/opp-2e9d7992da19477a939a85c9c169ced8/sources/doc_3260?requirement=AUTO-SECURITY-14",
        "sourceDocumentName": "EDGE PWS Draft.docx",
        "sourceSection": "KNOWLEDGE TRANSFER",
        "sourcePage": null,
        "sourceExcerpt": "KNOWLEDGE TRANSFER The outgoing Contractor shall provide knowledge transfer to the incoming Contractor and the Government, including but not limited to: Project architecture, design, and data model documentation Configuration details of LCNC applications, workflows, automations, and integrations Security and compliance documentation, including ATO artifacts Current backlog, product roadmap, unresolved defects, and re",
        "citationQuality": "Section-level citation"
      }
    },
    {
      "rowId": "AUTO-SECURITY-19",
      "matrixSection": "Security / Privacy",
      "requirement": "KNOWLEDGE TRANSFER PARTICIPATION The Contractor shall attend all Government-directed knowledge transfer sessions conducted by the outgoing Contractor.",
      "obligation": "MANDATORY",
      "obligationLabel": "Required",
      "criticality": "high",
      "lifecycle": null,
      "applicability": {},
      "evidenceArtifacts": [],
      "whatToPrepare": "Security and compliance response",
      "sourceBasis": null,
      "rowConfidence": {},
      "validationFlags": [],
      "evidenceLinks": [],
      "evidence": {
        "sourceDocumentId": "doc_3260",
        "sourceDocumentHref": "https://capture.govscope.io/cases/opp-2e9d7992da19477a939a85c9c169ced8/sources/doc_3260?requirement=AUTO-SECURITY-19",
        "sourceDocumentName": "EDGE PWS Draft.docx",
        "sourceSection": "KNOWLEDGE TRANSFER PARTICIPATION",
        "sourcePage": null,
        "sourceExcerpt": "KNOWLEDGE TRANSFER PARTICIPATION The Contractor shall attend all Government-directed knowledge transfer sessions conducted by the outgoing Contractor.",
        "citationQuality": "Section-level citation"
      }
    },
    {
      "rowId": "AUTO-SECURITY-8",
      "matrixSection": "Security / Privacy",
      "requirement": "PRIVACY TRAINING The Contractor shall ensure that all personnel submit Talent Management System (TMS) Training Certificates of completion for VA Privacy and Information Security Awareness and Rules of Behavior and provide signed copies of the Contractor Rules of Behavior in accordance with Section 9, Training, from Appendix C of the VA Handbook 6500.6, “Contract Security” which can be found at Addendum B of this PWS.",
      "obligation": "MANDATORY",
      "obligationLabel": "Required",
      "criticality": "high",
      "lifecycle": null,
      "applicability": {},
      "evidenceArtifacts": [],
      "whatToPrepare": "Security and compliance response",
      "sourceBasis": null,
      "rowConfidence": {},
      "validationFlags": [],
      "evidenceLinks": [],
      "evidence": {
        "sourceDocumentId": "doc_3260",
        "sourceDocumentHref": "https://capture.govscope.io/cases/opp-2e9d7992da19477a939a85c9c169ced8/sources/doc_3260?requirement=AUTO-SECURITY-8",
        "sourceDocumentName": "EDGE PWS Draft.docx",
        "sourceSection": "PRIVACY TRAINING",
        "sourcePage": null,
        "sourceExcerpt": "PRIVACY TRAINING The Contractor shall ensure that all personnel submit Talent Management System (TMS) Training Certificates of completion for VA Privacy and Information Security Awareness and Rules of Behavior and provide signed copies of the Contractor Rules of Behavior in accordance with Section 9, Training, from Appendix C of the VA Handbook 6500.6, “Contract Security” which can be found at Addendum B of this PWS.",
        "citationQuality": "Section-level citation"
      }
    },
    {
      "rowId": "AUTO-SECURITY-18",
      "matrixSection": "Security / Privacy",
      "requirement": "In instances of theft or break-in or other criminal activity, the Contractor/Subcontractor must concurrently report the incident to the appropriate law enforcement entity (or entities) of jurisdiction, including the VA OIG and the VA Office of Security and Law Enforcement.",
      "obligation": "MANDATORY",
      "obligationLabel": "Required",
      "criticality": "high",
      "lifecycle": null,
      "applicability": {},
      "evidenceArtifacts": [],
      "whatToPrepare": "Security and compliance response",
      "sourceBasis": null,
      "rowConfidence": {},
      "validationFlags": [],
      "evidenceLinks": [],
      "evidence": {
        "sourceDocumentId": "doc_3260",
        "sourceDocumentHref": "https://capture.govscope.io/cases/opp-2e9d7992da19477a939a85c9c169ced8/sources/doc_3260?requirement=AUTO-SECURITY-18",
        "sourceDocumentName": "EDGE PWS Draft.docx",
        "sourceSection": "SECURITY INCIDENT INVESTIGATION",
        "sourcePage": null,
        "sourceExcerpt": "In instances of theft or break-in or other criminal activity, the Contractor/Subcontractor must concurrently report the incident to the appropriate law enforcement entity (or entities) of jurisdiction, including the VA OIG and the VA Office of Security and Law Enforcement.",
        "citationQuality": "Section-level citation"
      }
    },
    {
      "rowId": "REQ-012",
      "matrixSection": "Security / Privacy",
      "requirement": "Provide a roster of employees to the COR within 3 business days after award for background investigations.",
      "obligation": "MANDATORY",
      "obligationLabel": "Required",
      "criticality": "high",
      "lifecycle": null,
      "applicability": {},
      "evidenceArtifacts": [],
      "whatToPrepare": null,
      "sourceBasis": null,
      "rowConfidence": {},
      "validationFlags": [],
      "evidenceLinks": [],
      "evidence": {
        "sourceDocumentId": "doc_3260",
        "sourceDocumentHref": "https://capture.govscope.io/cases/opp-2e9d7992da19477a939a85c9c169ced8/sources/doc_3260?requirement=REQ-012",
        "sourceDocumentName": "EDGE PWS Draft.docx",
        "sourceSection": "6.2.2 CONTRACTOR PERSONNEL SECURITY REQUIREMENTS",
        "sourcePage": "72",
        "sourceExcerpt": "Within 3 business days after award, the Contractor shall provide a roster of Contractor and Subcontractor employees to the COR to begin their background investigations in accordance with the PAL template artifact.",
        "citationQuality": "Section-level citation"
      }
    },
    {
      "rowId": "AUTO-SECURITY",
      "matrixSection": "Security / Privacy",
      "requirement": "Prescreen all personnel requiring system access for appropriate Background Investigation and English language proficiency.",
      "obligation": "MANDATORY",
      "obligationLabel": "Required",
      "criticality": "high",
      "lifecycle": null,
      "applicability": {},
      "evidenceArtifacts": [],
      "whatToPrepare": null,
      "sourceBasis": null,
      "rowConfidence": {},
      "validationFlags": [],
      "evidenceLinks": [],
      "evidence": {
        "sourceDocumentId": "doc_3260",
        "sourceDocumentHref": "https://capture.govscope.io/cases/opp-2e9d7992da19477a939a85c9c169ced8/sources/doc_3260?requirement=AUTO-SECURITY",
        "sourceDocumentName": "EDGE PWS Draft.docx",
        "sourceSection": "CONTRACTOR PERSONNEL SECURITY REQUIREMENTS",
        "sourcePage": null,
        "sourceExcerpt": "The Contractor shall prescreen all personnel requiring access to the computer systems to ensure they maintain the appropriate Background Investigation, and are able to read, write, speak, and understand the English language.",
        "citationQuality": "Section-level citation"
      }
    },
    {
      "rowId": "REQ-008",
      "matrixSection": "Technical",
      "requirement": "Describe experience staffing and managing a minimum of 200 concurrent Scrum teams.",
      "obligation": "MANDATORY",
      "obligationLabel": "Required",
      "criticality": "high",
      "lifecycle": null,
      "applicability": {},
      "evidenceArtifacts": [],
      "whatToPrepare": "Capability Package",
      "sourceBasis": null,
      "rowConfidence": {},
      "validationFlags": [],
      "evidenceLinks": [],
      "evidence": {
        "sourceDocumentId": "doc_3261",
        "sourceDocumentHref": "https://capture.govscope.io/cases/opp-2e9d7992da19477a939a85c9c169ced8/sources/doc_3261?requirement=REQ-008",
        "sourceDocumentName": "EDGE RFI 36C10B26Q0245.docx",
        "sourceSection": "RFI Response Instructions",
        "sourcePage": "2",
        "sourceExcerpt": "Describe your experience in simultaneously staffing and managing multiple concurrent Scrum teams (minimum of 200 teams at once) across different task areas or product lines throughout the full lifecycle.",
        "citationQuality": "Section-level citation"
      }
    },
    {
      "rowId": "AUTO-TECHNICAL-34",
      "matrixSection": "Technical",
      "requirement": "The Contractor shall provide four-week iterations per exercise of O&M supported by one FTE (minimum of one FTE resource (one FTE= 1,920 hours per year; minimum 147.7 hours per 4-week iteration per FTE) delivered with the appropriate technical skill sets listed above and in accordance with Section 5.1.7 Project Management Oversight/Key Personnel (as applicable).",
      "obligation": "CONDITIONAL",
      "obligationLabel": "If Applicable",
      "criticality": "high",
      "lifecycle": null,
      "applicability": {},
      "evidenceArtifacts": [],
      "whatToPrepare": "Technical approach / solution architecture response",
      "sourceBasis": null,
      "rowConfidence": {},
      "validationFlags": [],
      "evidenceLinks": [],
      "evidence": {
        "sourceDocumentId": "doc_3260",
        "sourceDocumentHref": "https://capture.govscope.io/cases/opp-2e9d7992da19477a939a85c9c169ced8/sources/doc_3260?requirement=AUTO-TECHNICAL-34",
        "sourceDocumentName": "EDGE PWS Draft.docx",
        "sourceSection": "EXISTING EDGE SOLUTIONS O&M (OPTIONAL TASK 6)",
        "sourcePage": null,
        "sourceExcerpt": "The Contractor shall provide four-week iterations per exercise of O&M supported by one FTE (minimum of one FTE resource (one FTE= 1,920 hours per year; minimum 147.7 hours per 4-week iteration per FTE) delivered with the appropriate technical skill sets listed above and in accordance with Section 5.1.7 Project Management Oversight/Key Personnel (as applicable).",
        "citationQuality": "Section-level citation"
      }
    },
    {
      "rowId": "AUTO-TECHNICAL-4",
      "matrixSection": "Technical",
      "requirement": "INFORMATION TECHNOLOGY INFRASTRUCTURE LIBRARY (ITIL) SERVICE OPERATIONS The Contractor shall provide Information Technology Infrastructure Library (ITIL) services operations for Incident Management, Event Management, Access Management, Request Fulfillment, and Problem Management.",
      "obligation": "MANDATORY",
      "obligationLabel": "Required",
      "criticality": "medium",
      "lifecycle": null,
      "applicability": {},
      "evidenceArtifacts": [],
      "whatToPrepare": null,
      "sourceBasis": null,
      "rowConfidence": {},
      "validationFlags": [],
      "evidenceLinks": [],
      "evidence": {
        "sourceDocumentId": "doc_3260",
        "sourceDocumentHref": "https://capture.govscope.io/cases/opp-2e9d7992da19477a939a85c9c169ced8/sources/doc_3260?requirement=AUTO-TECHNICAL-4",
        "sourceDocumentName": "EDGE PWS Draft.docx",
        "sourceSection": "INFORMATION TECHNOLOGY INFRASTRUCTURE LIBRARY (ITIL) SERVICE OPERATIONS",
        "sourcePage": null,
        "sourceExcerpt": "INFORMATION TECHNOLOGY INFRASTRUCTURE LIBRARY (ITIL) SERVICE OPERATIONS The Contractor shall provide Information Technology Infrastructure Library (ITIL) services operations for Incident Management, Event Management, Access Management, Request Fulfillment, and Problem Management.",
        "citationQuality": "Section-level citation"
      }
    },
    {
      "rowId": "AUTO-TECHNICAL-13",
      "matrixSection": "Technical",
      "requirement": "The Contractor Onboarding POC shall be responsible for accurate and timely submission of all required VA onboarding paperwork to the COR or his/her onboarding designee.",
      "obligation": "MANDATORY",
      "obligationLabel": "Required",
      "criticality": "medium",
      "lifecycle": null,
      "applicability": {},
      "evidenceArtifacts": [],
      "whatToPrepare": null,
      "sourceBasis": null,
      "rowConfidence": {},
      "validationFlags": [],
      "evidenceLinks": [],
      "evidence": {
        "sourceDocumentId": "doc_3260",
        "sourceDocumentHref": "https://capture.govscope.io/cases/opp-2e9d7992da19477a939a85c9c169ced8/sources/doc_3260?requirement=AUTO-TECHNICAL-13",
        "sourceDocumentName": "EDGE PWS Draft.docx",
        "sourceSection": "ONBOARDING",
        "sourcePage": null,
        "sourceExcerpt": "The Contractor Onboarding POC shall be responsible for accurate and timely submission of all required VA onboarding paperwork to the COR or his/her onboarding designee.",
        "citationQuality": "Section-level citation"
      }
    },
    {
      "rowId": "AUTO-TECHNICAL-18",
      "matrixSection": "Technical",
      "requirement": "In the event that NSD is not providing Tier 1 support on a EDGE solution basis, the Contractor shall provide Tier 1 support for the specified individual EDGE solutions.",
      "obligation": "MANDATORY",
      "obligationLabel": "Required",
      "criticality": "medium",
      "lifecycle": null,
      "applicability": {},
      "evidenceArtifacts": [],
      "whatToPrepare": null,
      "sourceBasis": null,
      "rowConfidence": {},
      "validationFlags": [],
      "evidenceLinks": [],
      "evidence": {
        "sourceDocumentId": "doc_3260",
        "sourceDocumentHref": "https://capture.govscope.io/cases/opp-2e9d7992da19477a939a85c9c169ced8/sources/doc_3260?requirement=AUTO-TECHNICAL-18",
        "sourceDocumentName": "EDGE PWS Draft.docx",
        "sourceSection": "SERVICE DESK SUPPORT",
        "sourcePage": null,
        "sourceExcerpt": "In the event that NSD is not providing Tier 1 support on a EDGE solution basis, the Contractor shall provide Tier 1 support for the specified individual EDGE solutions.",
        "citationQuality": "Section-level citation"
      }
    },
    {
      "rowId": "AUTO-TECHNICAL-33",
      "matrixSection": "Technical",
      "requirement": "AGILE EXECUTION The Contractor shall document, validate, and execute the team design and testing tasks and requirements IAW Section 5.2.4.1 Team Planning, Section 5.2.3 Solution Architecture & Engineering, and Section 5.2.1 Agile Requirements Elicitation and Elaboration.",
      "obligation": "MANDATORY",
      "obligationLabel": "Required",
      "criticality": "high",
      "lifecycle": null,
      "applicability": {},
      "evidenceArtifacts": [],
      "whatToPrepare": "Technical approach / solution architecture response",
      "sourceBasis": null,
      "rowConfidence": {},
      "validationFlags": [],
      "evidenceLinks": [],
      "evidence": {
        "sourceDocumentId": "doc_3260",
        "sourceDocumentHref": "https://capture.govscope.io/cases/opp-2e9d7992da19477a939a85c9c169ced8/sources/doc_3260?requirement=AUTO-TECHNICAL-33",
        "sourceDocumentName": "EDGE PWS Draft.docx",
        "sourceSection": "AGILE EXECUTION",
        "sourcePage": null,
        "sourceExcerpt": "AGILE EXECUTION The Contractor shall document, validate, and execute the team design and testing tasks and requirements IAW Section 5.2.4.1 Team Planning, Section 5.2.3 Solution Architecture & Engineering, and Section 5.2.1 Agile Requirements Elicitation and Elaboration.",
        "citationQuality": "Section-level citation"
      }
    },
    {
      "rowId": "AUTO-TECHNICAL-32",
      "matrixSection": "Technical",
      "requirement": "Classify requirements as follows: New Feature Enhancement Feature Non-Functional Technology Investment Defect In addition, the Contractor shall ensure that defects are mapped back to the original agile requirement.",
      "obligation": "MANDATORY",
      "obligationLabel": "Required",
      "criticality": "high",
      "lifecycle": null,
      "applicability": {},
      "evidenceArtifacts": [],
      "whatToPrepare": "Technical approach / solution architecture response",
      "sourceBasis": null,
      "rowConfidence": {},
      "validationFlags": [],
      "evidenceLinks": [],
      "evidence": {
        "sourceDocumentId": "doc_3260",
        "sourceDocumentHref": "https://capture.govscope.io/cases/opp-2e9d7992da19477a939a85c9c169ced8/sources/doc_3260?requirement=AUTO-TECHNICAL-32",
        "sourceDocumentName": "EDGE PWS Draft.docx",
        "sourceSection": "AGILE REQUIREMENTS ELICITATION AND ELABORATION",
        "sourcePage": null,
        "sourceExcerpt": "Classify requirements as follows: New Feature Enhancement Feature Non-Functional Technology Investment Defect In addition, the Contractor shall ensure that defects are mapped back to the original agile requirement.",
        "citationQuality": "Section-level citation"
      }
    },
    {
      "rowId": "AUTO-TECHNICAL-30",
      "matrixSection": "Technical",
      "requirement": "The Contractor shall ensure that all delivered applications and system solutions support: Interfacing with VA’s Master Person Index (MPI) (formerly the Master Veteran Index (MVI)) to provision identity attributes, if the solution relies on VA user identities.",
      "obligation": "MANDATORY",
      "obligationLabel": "Required",
      "criticality": "high",
      "lifecycle": null,
      "applicability": {},
      "evidenceArtifacts": [],
      "whatToPrepare": "Technical approach / solution architecture response",
      "sourceBasis": null,
      "rowConfidence": {},
      "validationFlags": [],
      "evidenceLinks": [],
      "evidence": {
        "sourceDocumentId": "doc_3260",
        "sourceDocumentHref": "https://capture.govscope.io/cases/opp-2e9d7992da19477a939a85c9c169ced8/sources/doc_3260?requirement=AUTO-TECHNICAL-30",
        "sourceDocumentName": "EDGE PWS Draft.docx",
        "sourceSection": "AUTHORITATIVE DATA SOURCES",
        "sourcePage": null,
        "sourceExcerpt": "The Contractor shall ensure that all delivered applications and system solutions support: Interfacing with VA’s Master Person Index (MPI) (formerly the Master Veteran Index (MVI)) to provision identity attributes, if the solution relies on VA user identities.",
        "citationQuality": "Section-level citation"
      }
    },
    {
      "rowId": "AUTO-REPORTING-4",
      "matrixSection": "Deliverables",
      "requirement": "Additionally, the Contractor shall provide a status of all reportable GFE as part of the Monthly Status Report as required by PWS paragraph 5.1.",
      "obligation": "MANDATORY",
      "obligationLabel": "Required",
      "criticality": "medium",
      "lifecycle": null,
      "applicability": {},
      "evidenceArtifacts": [],
      "whatToPrepare": null,
      "sourceBasis": null,
      "rowConfidence": {},
      "validationFlags": [],
      "evidenceLinks": [],
      "evidence": {
        "sourceDocumentId": "doc_3260",
        "sourceDocumentHref": "https://capture.govscope.io/cases/opp-2e9d7992da19477a939a85c9c169ced8/sources/doc_3260?requirement=AUTO-REPORTING-4",
        "sourceDocumentName": "EDGE PWS Draft.docx",
        "sourceSection": "300 laptops",
        "sourcePage": null,
        "sourceExcerpt": "Additionally, the Contractor shall provide a status of all reportable GFE as part of the Monthly Status Report as required by PWS paragraph 5.1.",
        "citationQuality": "Section-level citation"
      }
    },
    {
      "rowId": "AUTO-REPORTING-3",
      "matrixSection": "Deliverables",
      "requirement": "WEEKLY ACTIVITY REPORT The Contractor shall provide a Weekly Activity Report to include the EDGE Program Brief detailing any risks and dependencies on a weekly basis.",
      "obligation": "MANDATORY",
      "obligationLabel": "Required",
      "criticality": "medium",
      "lifecycle": null,
      "applicability": {},
      "evidenceArtifacts": [],
      "whatToPrepare": null,
      "sourceBasis": null,
      "rowConfidence": {},
      "validationFlags": [],
      "evidenceLinks": [],
      "evidence": {
        "sourceDocumentId": "doc_3260",
        "sourceDocumentHref": "https://capture.govscope.io/cases/opp-2e9d7992da19477a939a85c9c169ced8/sources/doc_3260?requirement=AUTO-REPORTING-3",
        "sourceDocumentName": "EDGE PWS Draft.docx",
        "sourceSection": "WEEKLY ACTIVITY REPORT",
        "sourcePage": null,
        "sourceExcerpt": "WEEKLY ACTIVITY REPORT The Contractor shall provide a Weekly Activity Report to include the EDGE Program Brief detailing any risks and dependencies on a weekly basis.",
        "citationQuality": "Section-level citation"
      }
    },
    {
      "rowId": "AUTO-DELIVERABLE-8",
      "matrixSection": "Deliverables",
      "requirement": "The Contractor shall provide Elevated Permissions Training Certificate.",
      "obligation": "MANDATORY",
      "obligationLabel": "Required",
      "criticality": "medium",
      "lifecycle": null,
      "applicability": {},
      "evidenceArtifacts": [],
      "whatToPrepare": null,
      "sourceBasis": null,
      "rowConfidence": {},
      "validationFlags": [],
      "evidenceLinks": [],
      "evidence": {
        "sourceDocumentId": "doc_3260",
        "sourceDocumentHref": "https://capture.govscope.io/cases/opp-2e9d7992da19477a939a85c9c169ced8/sources/doc_3260?requirement=AUTO-DELIVERABLE-8",
        "sourceDocumentName": "EDGE PWS Draft.docx",
        "sourceSection": "ELEVATED PERMISSIONS TRAINING",
        "sourcePage": null,
        "sourceExcerpt": "The Contractor shall provide Elevated Permissions Training Certificate.",
        "citationQuality": "Section-level citation"
      }
    },
    {
      "rowId": "AUTO-DELIVERABLE-7",
      "matrixSection": "Deliverables",
      "requirement": "The Contractor shall submit the final updated Kickoff Meeting Power Point Presentation to the CO, CS, and COR for review three calendar days after the meeting.",
      "obligation": "MANDATORY",
      "obligationLabel": "Required",
      "criticality": "medium",
      "lifecycle": null,
      "applicability": {},
      "evidenceArtifacts": [],
      "whatToPrepare": null,
      "sourceBasis": null,
      "rowConfidence": {},
      "validationFlags": [],
      "evidenceLinks": [],
      "evidence": {
        "sourceDocumentId": "doc_3260",
        "sourceDocumentHref": "https://capture.govscope.io/cases/opp-2e9d7992da19477a939a85c9c169ced8/sources/doc_3260?requirement=AUTO-DELIVERABLE-7",
        "sourceDocumentName": "EDGE PWS Draft.docx",
        "sourceSection": "TECHNICAL KICKOFF MEETING",
        "sourcePage": null,
        "sourceExcerpt": "The Contractor shall submit the final updated Kickoff Meeting Power Point Presentation to the CO, CS, and COR for review three calendar days after the meeting.",
        "citationQuality": "Section-level citation"
      }
    },
    {
      "rowId": "AUTO-DELIVERABLE-3",
      "matrixSection": "Deliverables",
      "requirement": "The Contractor shall provide to the COR/CO a copy of the training certificates and certification of signing the Organizational Rules of Behavior for each applicable employee within five days of the initiation of the contract and annually thereafter, as required.",
      "obligation": "MANDATORY",
      "obligationLabel": "Required",
      "criticality": "medium",
      "lifecycle": null,
      "applicability": {},
      "evidenceArtifacts": [],
      "whatToPrepare": null,
      "sourceBasis": null,
      "rowConfidence": {},
      "validationFlags": [],
      "evidenceLinks": [],
      "evidence": {
        "sourceDocumentId": "doc_3260",
        "sourceDocumentHref": "https://capture.govscope.io/cases/opp-2e9d7992da19477a939a85c9c169ced8/sources/doc_3260?requirement=AUTO-DELIVERABLE-3",
        "sourceDocumentName": "EDGE PWS Draft.docx",
        "sourceSection": "TRAINING",
        "sourcePage": null,
        "sourceExcerpt": "The Contractor shall provide to the COR/CO a copy of the training certificates and certification of signing the Organizational Rules of Behavior for each applicable employee within five days of the initiation of the contract and annually thereafter, as required.",
        "citationQuality": "Section-level citation"
      }
    },
    {
      "rowId": "AUTO-DELIVERABLE-6",
      "matrixSection": "Deliverables",
      "requirement": "TRAINING SERVICES The Contractor shall develop and deliver a Training Plan detailing the planning and delivery of instruction leveraging the most appropriate training methods and materials for the EDGE solution.",
      "obligation": "MANDATORY",
      "obligationLabel": "Required",
      "criticality": "medium",
      "lifecycle": null,
      "applicability": {},
      "evidenceArtifacts": [],
      "whatToPrepare": null,
      "sourceBasis": null,
      "rowConfidence": {},
      "validationFlags": [],
      "evidenceLinks": [],
      "evidence": {
        "sourceDocumentId": "doc_3260",
        "sourceDocumentHref": "https://capture.govscope.io/cases/opp-2e9d7992da19477a939a85c9c169ced8/sources/doc_3260?requirement=AUTO-DELIVERABLE-6",
        "sourceDocumentName": "EDGE PWS Draft.docx",
        "sourceSection": "TRAINING SERVICES",
        "sourcePage": null,
        "sourceExcerpt": "TRAINING SERVICES The Contractor shall develop and deliver a Training Plan detailing the planning and delivery of instruction leveraging the most appropriate training methods and materials for the EDGE solution.",
        "citationQuality": "Section-level citation"
      }
    },
    {
      "rowId": "AUTO-CONTRACTUAL-8",
      "matrixSection": "Contractual / Admin",
      "requirement": "ACCESS AND ENVIRONMENT VALIDATION The Contractor shall validate that all system administrator accounts, user access, credentials, and licenses have been transitioned to VA-controlled ownership.",
      "obligation": "MANDATORY",
      "obligationLabel": "Required",
      "criticality": "high",
      "lifecycle": null,
      "applicability": {},
      "evidenceArtifacts": [],
      "whatToPrepare": "Transition / contractual compliance approach",
      "sourceBasis": null,
      "rowConfidence": {},
      "validationFlags": [],
      "evidenceLinks": [],
      "evidence": {
        "sourceDocumentId": "doc_3260",
        "sourceDocumentHref": "https://capture.govscope.io/cases/opp-2e9d7992da19477a939a85c9c169ced8/sources/doc_3260?requirement=AUTO-CONTRACTUAL-8",
        "sourceDocumentName": "EDGE PWS Draft.docx",
        "sourceSection": "ACCESS AND ENVIRONMENT VALIDATION",
        "sourcePage": null,
        "sourceExcerpt": "ACCESS AND ENVIRONMENT VALIDATION The Contractor shall validate that all system administrator accounts, user access, credentials, and licenses have been transitioned to VA-controlled ownership.",
        "citationQuality": "Section-level citation"
      }
    },
    {
      "rowId": "AUTO-CONTRACTUAL-4",
      "matrixSection": "Contractual / Admin",
      "requirement": "The Contractor shall develop a Transition Acceptance Report as formal certification that the Contractor has received, validated, and assumed ownership of all required documentation, access, and responsibilities.",
      "obligation": "MANDATORY",
      "obligationLabel": "Required",
      "criticality": "high",
      "lifecycle": null,
      "applicability": {},
      "evidenceArtifacts": [],
      "whatToPrepare": "Transition / contractual compliance approach",
      "sourceBasis": null,
      "rowConfidence": {},
      "validationFlags": [],
      "evidenceLinks": [],
      "evidence": {
        "sourceDocumentId": "doc_3260",
        "sourceDocumentHref": "https://capture.govscope.io/cases/opp-2e9d7992da19477a939a85c9c169ced8/sources/doc_3260?requirement=AUTO-CONTRACTUAL-4",
        "sourceDocumentName": "EDGE PWS Draft.docx",
        "sourceSection": "INCOMING TRANSITION STATUS AND REPORTING",
        "sourcePage": null,
        "sourceExcerpt": "The Contractor shall develop a Transition Acceptance Report as formal certification that the Contractor has received, validated, and assumed ownership of all required documentation, access, and responsibilities.",
        "citationQuality": "Section-level citation"
      }
    },
    {
      "rowId": "AUTO-CONTRACTUAL-6",
      "matrixSection": "Contractual / Admin",
      "requirement": "OUTGOING TRANSITION STATUS AND REPORTING Provide incoming Contractor acknowledges sufficient receipt of documentation, access, and knowledge transfer to assume project responsibilities.",
      "obligation": "MANDATORY",
      "obligationLabel": "Required",
      "criticality": "high",
      "lifecycle": null,
      "applicability": {},
      "evidenceArtifacts": [],
      "whatToPrepare": "Transition / contractual compliance approach",
      "sourceBasis": null,
      "rowConfidence": {},
      "validationFlags": [],
      "evidenceLinks": [],
      "evidence": {
        "sourceDocumentId": "doc_3260",
        "sourceDocumentHref": "https://capture.govscope.io/cases/opp-2e9d7992da19477a939a85c9c169ced8/sources/doc_3260?requirement=AUTO-CONTRACTUAL-6",
        "sourceDocumentName": "EDGE PWS Draft.docx",
        "sourceSection": "OUTGOING TRANSITION STATUS AND REPORTING",
        "sourcePage": null,
        "sourceExcerpt": "OUTGOING TRANSITION STATUS AND REPORTING Provide incoming Contractor acknowledges sufficient receipt of documentation, access, and knowledge transfer to assume project responsibilities.",
        "citationQuality": "Section-level citation"
      }
    },
    {
      "rowId": "AUTO-CONTRACTUAL-5",
      "matrixSection": "Contractual / Admin",
      "requirement": "TRANSITION PLANNING The Contractor shall review the outgoing Contractor’s Transition Plan and provide feedback to the Government within five (5) business days of receipt.",
      "obligation": "MANDATORY",
      "obligationLabel": "Required",
      "criticality": "high",
      "lifecycle": null,
      "applicability": {},
      "evidenceArtifacts": [],
      "whatToPrepare": "Transition / contractual compliance approach",
      "sourceBasis": null,
      "rowConfidence": {},
      "validationFlags": [],
      "evidenceLinks": [],
      "evidence": {
        "sourceDocumentId": "doc_3260",
        "sourceDocumentHref": "https://capture.govscope.io/cases/opp-2e9d7992da19477a939a85c9c169ced8/sources/doc_3260?requirement=AUTO-CONTRACTUAL-5",
        "sourceDocumentName": "EDGE PWS Draft.docx",
        "sourceSection": "TRANSITION PLANNING",
        "sourcePage": null,
        "sourceExcerpt": "TRANSITION PLANNING The Contractor shall review the outgoing Contractor’s Transition Plan and provide feedback to the Government within five (5) business days of receipt.",
        "citationQuality": "Section-level citation"
      }
    },
    {
      "rowId": "AUTO-CONTRACTUAL-7",
      "matrixSection": "Contractual / Admin",
      "requirement": "TRANSITION PLANNING The outgoing Contractor shall develop and submit a Transition Plan within ten (10) business days of Government notice to transition.",
      "obligation": "MANDATORY",
      "obligationLabel": "Required",
      "criticality": "high",
      "lifecycle": null,
      "applicability": {},
      "evidenceArtifacts": [],
      "whatToPrepare": "Transition / contractual compliance approach",
      "sourceBasis": null,
      "rowConfidence": {},
      "validationFlags": [],
      "evidenceLinks": [],
      "evidence": {
        "sourceDocumentId": "doc_3260",
        "sourceDocumentHref": "https://capture.govscope.io/cases/opp-2e9d7992da19477a939a85c9c169ced8/sources/doc_3260?requirement=AUTO-CONTRACTUAL-7",
        "sourceDocumentName": "EDGE PWS Draft.docx",
        "sourceSection": "TRANSITION PLANNING",
        "sourcePage": null,
        "sourceExcerpt": "TRANSITION PLANNING The outgoing Contractor shall develop and submit a Transition Plan within ten (10) business days of Government notice to transition.",
        "citationQuality": "Section-level citation"
      }
    },
    {
      "rowId": "REQ-009",
      "matrixSection": "Contractual / Admin",
      "requirement": "Perform all work under this contract within the United States.",
      "obligation": "MANDATORY",
      "obligationLabel": "Required",
      "criticality": "medium",
      "lifecycle": null,
      "applicability": {},
      "evidenceArtifacts": [],
      "whatToPrepare": null,
      "sourceBasis": null,
      "rowConfidence": {},
      "validationFlags": [],
      "evidenceLinks": [],
      "evidence": {
        "sourceDocumentId": "doc_3260",
        "sourceDocumentHref": "https://capture.govscope.io/cases/opp-2e9d7992da19477a939a85c9c169ced8/sources/doc_3260?requirement=REQ-009",
        "sourceDocumentName": "EDGE PWS Draft.docx",
        "sourceSection": "4.2 PLACE OF PERFORMANCE",
        "sourcePage": "16",
        "sourceExcerpt": "No work under this contract shall take place outside the United States.",
        "citationQuality": "Section-level citation"
      }
    },
    {
      "rowId": "REQ-010",
      "matrixSection": "Key Personnel / Staffing",
      "requirement": "Do not substitute or replace Key Personnel within the first six months after award.",
      "obligation": "MANDATORY",
      "obligationLabel": "Required",
      "criticality": "high",
      "lifecycle": null,
      "applicability": {},
      "evidenceArtifacts": [],
      "whatToPrepare": null,
      "sourceBasis": null,
      "rowConfidence": {},
      "validationFlags": [],
      "evidenceLinks": [],
      "evidence": {
        "sourceDocumentId": "doc_3260",
        "sourceDocumentHref": "https://capture.govscope.io/cases/opp-2e9d7992da19477a939a85c9c169ced8/sources/doc_3260?requirement=REQ-010",
        "sourceDocumentName": "EDGE PWS Draft.docx",
        "sourceSection": "5.1.7 PRODUCT MANAGEMENT AND OVERSIGHT/KEY PERSONNEL",
        "sourcePage": "19",
        "sourceExcerpt": "The substitution or replacement of the personnel shall not occur within the first six months after the date of award.",
        "citationQuality": "Section-level citation"
      }
    },
    {
      "rowId": "AUTO-KEY_PERSONNEL",
      "matrixSection": "Key Personnel / Staffing",
      "requirement": "Do not remove, replace, or add Key Personnel without a compelling reason and written notification to the Contracting Officer.",
      "obligation": "MANDATORY",
      "obligationLabel": "Required",
      "criticality": "high",
      "lifecycle": null,
      "applicability": {},
      "evidenceArtifacts": [],
      "whatToPrepare": "Key Personnel Resumes / Staffing Plan",
      "sourceBasis": null,
      "rowConfidence": {},
      "validationFlags": [],
      "evidenceLinks": [],
      "evidence": {
        "sourceDocumentId": "doc_3260",
        "sourceDocumentHref": "https://capture.govscope.io/cases/opp-2e9d7992da19477a939a85c9c169ced8/sources/doc_3260?requirement=AUTO-KEY_PERSONNEL",
        "sourceDocumentName": "EDGE PWS Draft.docx",
        "sourceSection": "PRODUCT MANAGEMENT AND OVERSIGHT/KEY PERSONNEL",
        "sourcePage": null,
        "sourceExcerpt": "Shall not be removed from the effort, replaced or added without a compelling reason and without written notification to the CO.",
        "citationQuality": "Section-level citation"
      }
    },
    {
      "rowId": "AUTO-KEY_PERSONNEL-2",
      "matrixSection": "Key Personnel / Staffing",
      "requirement": "Immediately notify the CO/CS/COR/PM in writing of any Key Personnel changes. Proposed replacements must meet or exceed designated qualifications and be of substantially equal ability.",
      "obligation": "MANDATORY",
      "obligationLabel": "Required",
      "criticality": "high",
      "lifecycle": null,
      "applicability": {},
      "evidenceArtifacts": [],
      "whatToPrepare": null,
      "sourceBasis": null,
      "rowConfidence": {},
      "validationFlags": [],
      "evidenceLinks": [],
      "evidence": {
        "sourceDocumentId": "doc_3260",
        "sourceDocumentHref": "https://capture.govscope.io/cases/opp-2e9d7992da19477a939a85c9c169ced8/sources/doc_3260?requirement=AUTO-KEY_PERSONNEL-2",
        "sourceDocumentName": "EDGE PWS Draft.docx",
        "sourceSection": "PRODUCT MANAGEMENT AND OVERSIGHT/KEY PERSONNEL",
        "sourcePage": null,
        "sourceExcerpt": "The Contractor shall immediately notify the CO/CS/COR/PM in writing. The proposed replacement personnel shall be of at least substantially equal ability and qualifications",
        "citationQuality": "Section-level citation"
      }
    },
    {
      "rowId": "AUTO-KEY_PERSONNEL-3",
      "matrixSection": "Key Personnel / Staffing",
      "requirement": "PLACE OF PERFORMANCE A majority of the efforts under this contract shall be performed at Contractor facilities and work may be performed at remote locations with prior concurrence from the Contracting Officer’s Representative (COR).",
      "obligation": "CONDITIONAL",
      "obligationLabel": "If Applicable",
      "criticality": "medium",
      "lifecycle": null,
      "applicability": {},
      "evidenceArtifacts": [],
      "whatToPrepare": "Staffing plan / resumes",
      "sourceBasis": null,
      "rowConfidence": {},
      "validationFlags": [],
      "evidenceLinks": [],
      "evidence": {
        "sourceDocumentId": "doc_3260",
        "sourceDocumentHref": "https://capture.govscope.io/cases/opp-2e9d7992da19477a939a85c9c169ced8/sources/doc_3260?requirement=AUTO-KEY_PERSONNEL-3",
        "sourceDocumentName": "EDGE PWS Draft.docx",
        "sourceSection": "PLACE OF PERFORMANCE",
        "sourcePage": null,
        "sourceExcerpt": "PLACE OF PERFORMANCE A majority of the efforts under this contract shall be performed at Contractor facilities and work may be performed at remote locations with prior concurrence from the Contracting Officer’s Representative (COR).",
        "citationQuality": "Section-level citation"
      }
    },
    {
      "rowId": "REQ-001",
      "matrixSection": "Submission",
      "requirement": "Submit RFI response electronically via email by 3:00 PM EDT on March 25, 2026.",
      "obligation": "MANDATORY",
      "obligationLabel": "Required",
      "criticality": "high",
      "lifecycle": null,
      "applicability": {},
      "evidenceArtifacts": [],
      "whatToPrepare": "Email Submission",
      "sourceBasis": null,
      "rowConfidence": {},
      "validationFlags": [],
      "evidenceLinks": [],
      "evidence": {
        "sourceDocumentId": "doc_3261",
        "sourceDocumentHref": "https://capture.govscope.io/cases/opp-2e9d7992da19477a939a85c9c169ced8/sources/doc_3261?requirement=REQ-001",
        "sourceDocumentName": "EDGE RFI 36C10B26Q0245.docx",
        "sourceSection": "RFI Response Instructions",
        "sourcePage": "2",
        "sourceExcerpt": "Responses to this RFI shall be submitted electronically by 3:00 PM Eastern Daylight Time, March 25, 2026 via email the Technology Acquisition Center (TAC) points of contact",
        "citationQuality": "Section-level citation"
      }
    },
    {
      "rowId": "AUTO-PRICING",
      "matrixSection": "Pricing",
      "requirement": "Contractor travel within the local commuting area will not be reimbursed. The Contractor shall provide cost estimates with each travel request to the COR.",
      "obligation": "MANDATORY",
      "obligationLabel": "Required",
      "criticality": "high",
      "lifecycle": null,
      "applicability": {},
      "evidenceArtifacts": [],
      "whatToPrepare": "Pricing table / price proposal",
      "sourceBasis": null,
      "rowConfidence": {},
      "validationFlags": [],
      "evidenceLinks": [],
      "evidence": {
        "sourceDocumentId": "doc_3260",
        "sourceDocumentHref": "https://capture.govscope.io/cases/opp-2e9d7992da19477a939a85c9c169ced8/sources/doc_3260?requirement=AUTO-PRICING",
        "sourceDocumentName": "EDGE PWS Draft.docx",
        "sourceSection": "Pricing",
        "sourcePage": null,
        "sourceExcerpt": "Contractor travel within the local commuting area will not be reimbursed. The Contractor shall provide cost estimates with each travel request to the COR.",
        "citationQuality": "Section-level citation"
      }
    },
    {
      "rowId": "AUTO-DUE_DATE",
      "matrixSection": "Schedule",
      "requirement": "Submit the proposal by 2026-03-25.",
      "obligation": "MANDATORY",
      "obligationLabel": "Required",
      "criticality": "high",
      "lifecycle": null,
      "applicability": {},
      "evidenceArtifacts": [],
      "whatToPrepare": "Complete proposal submission",
      "sourceBasis": null,
      "rowConfidence": {},
      "validationFlags": [],
      "evidenceLinks": [],
      "evidence": {
        "sourceDocumentId": "doc_notice_metadata",
        "sourceDocumentHref": "https://capture.govscope.io/cases/opp-2e9d7992da19477a939a85c9c169ced8/sources/doc_notice_metadata?requirement=AUTO-DUE_DATE",
        "sourceDocumentName": "DA10--Enterprise Digital Government Enablement (EDGE)  36C10B26Q0245",
        "sourceSection": "Schedule",
        "sourcePage": null,
        "sourceExcerpt": "36C10B26Q0245 See attached RFI documents. Mario Awad <Mario.Awad@va.gov> Published date: 2026-03-10 Proposal due date: 2026-03-25 date: 2026-03-25",
        "citationQuality": "Section-level citation"
      }
    },
    {
      "rowId": "REQ-014",
      "matrixSection": "Other important requirements",
      "requirement": "Comply with 508 Chapter 2 Scoping Requirements for all delivered electronic ICT and content.",
      "obligation": "MANDATORY",
      "obligationLabel": "Required",
      "criticality": "high",
      "lifecycle": null,
      "applicability": {},
      "evidenceArtifacts": [],
      "whatToPrepare": null,
      "sourceBasis": null,
      "rowConfidence": {},
      "validationFlags": [],
      "evidenceLinks": [],
      "evidence": {
        "sourceDocumentId": "doc_3260",
        "sourceDocumentHref": "https://capture.govscope.io/cases/opp-2e9d7992da19477a939a85c9c169ced8/sources/doc_3260?requirement=REQ-014",
        "sourceDocumentName": "EDGE PWS Draft.docx",
        "sourceSection": "ADDENDUM A – ADDITIONAL VA REQUIREMENTS, CONSOLIDATED",
        "sourcePage": "79",
        "sourceExcerpt": "The Contractor shall comply with “508 Chapter 2: Scoping Requirements” for all electronic ICT and content delivered under this contract.",
        "citationQuality": "Section-level citation"
      }
    }
  ]
}